Go To Search
Click to Home
PrintEmailFacebookTwitter
Sidewalk
COT-SW-01 CURB RAMP & SIDEWALK CONSTRUCTION NOTES 08/09/2010
COT-SW-02 CURB RAMP & SIDEWALK CONSTRUCTION NOTES 08/09/2010
COT-SW-03 CONCRETE SIDEWALK CONSTRUCTION DETAILS 08/09/2010
COT-SW-04 SIDEWALK EXPANSION JOINT CONSTRUCTION DETAILS 08/09/2010
COT-SW-05 ACCESSIBLE RAMP CURB & GUTTER CONSTRUCTION DETAILS 08/09/2010
COT-SW-06 ACCESSIBLE RAMP UNDERCUT CONSTRUCTION DETAILS 08/09/2010
COT-SW-07 TYPICAL CROSSWALK PLACEMENT DETAIL 08/09/2010
COT-SW-08 CONCRETE SIDEWALKS FOR CURB TYPE STREETS (GENERAL INFORMATION) 08/09/2010
COT-SW-09 PLACEMENT OF FIXTURES ALONG SIDEWALKS 08/09/2010
COT-SW-10 ACCESSIBLE RAMP SIDEWALK CONNECTION CONSTRUCTION DETAILS 08/09/2010
COT-SW-11 CROSS RAMP SIDEWALK CONNECTION ON OPEN DITCH 08/09/2010
COT-SW-12 ACCESSIBLE RAMP CROSS-SECTION 'A' FOR OPEN DITCH 08/09/2010
COT-SW-13 TYPICAL SINGLE ROADWAY SIDEWALK CONSTRUCTION DETAILS 08/09/2010
COT-SW-14 MODIFICATION FOR CROSSWALKS ON ISLANDS, MEDIANS OR CURBS 08/09/2010
COT-SW-15 SIDEWALK TREATMENT AT DRIVEWAYS CONSTRUCTION DETAILS 08/09/2010
COT-SW-16 PARALLEL CURB RAMP & SIDEWALK CONSTRUCTION DETAIL 08/09/2010
COT-SW-17 CURB RAMP AT MEDIAN ISLANDS CONSTRUCTION DETAILS 08/09/2010
COT-SW-18 TRUNCATED DOME PATTERN CURB RAMP CONSTRUCTION DETAILS 08/09/2010
COT-SW-19 CONCRETE PAVER WITH TRUNCATED DOME SURFACE 08/09/2010
COT-SW-20 CONCRETE PAVER WITH TRUNCATED DOME SURFACE CONSTRUCTION DETAILS 08/09/2010
  SIDEWALK COMBINED 08/09/2010

* = Required
Asterisk denotes required document for all plan submittals