Go To Search
Click to Home
PrintEmailFacebookTwitter
Division 1 -Requirements
01110
Summary of Work 1/6/2009
01145 Use of Premises 1/6/2009
01230 Alternates 1/6/2009
01255 Change Order Procedures 1/6/2009
01270 Measurement and Payment 1/6/2009
01292 Schedule of Values 1/6/2009
01312 Coordination and Meetings 1/6/2009
01321 Construction Photographs 1/6/2009
01322 Construction Photographs for Facility Projects 1/6/2009
01325 Construction Schedule 1/6/2009
01326 Construction Schedule (Bar Chart) 1/6/2009
01330 Submittal Procedures 1/6/2009
01340 Shop Drawings, Product Data, and Samples 1/6/2009
01410 TPDES Requirements (with Attachments) 9/8/2009
01422 Reference Standards 1/6/2009
01450 Contractor's Quality Control 1/6/2009
01452 Inspection Services 1/6/2009
01454 Testing Laboratory Services 1/6/2009
01502 Mobilization 1/6/2009
01504 Temporary Facilities and Controls 1/6/2009
01506 Diversion Pumping 1/6/2009
01520 Temporary Field Office 1/6/2009
01555 Traffic Control and Regulation 1/6/2009
01562 Tree and Plant Protection 1/6/2009
01570 Diverting Flow 1/6/2009
01572 Pollution Source Controls on Construction Projects 1/6/2009
01573 Managing Overland Flow 1/6/2009
01574 Trapping Sediment in Channelized Flow 1/6/2009
01575 Stabilized Construction Exit 1/6/2009
01576 Waste Material Disposal 1/6/2009
01577 Protecting Inlets 1/6/2009
01578 Control of Ground Water 1/6/2009
01579 Trapping Sediment During Site Dewatering 1/6/2009
01580 Project Identification Signs 1/6/2009
01581 Excavation in Public Way Permit Signs 1/6/2009
01610 Basic Product Requirements 1/6/2009
01630 Product Substitution Procedures 1/6/2009
01725 Field Surveying 1/6/2009
01731 Cutting and Patching 1/6/2009
01732 Procedure for Water Valve Assistance (with Attachments) 1/6/2009
01733 Procedure for New Water Line Disinfection 1/6/2009
01740 Restoration of Site Improvements 1/6/2009
01755 Starting Systems 1/6/2009
01770 Closeout Procedures 1/6/2009
01782 Operations and Maintenance Data 1/6/2009
01785 Project Record Documents 9/8/2009