Completed CIP projects include any project that has been completed as part of the City's Capital Improvement Plan. By clicking through the projects below, you can learn about the competed project including completion date and final cost.
City Facilities
Project Description
The City is making improvements to the the Police evidence lot on Malone Street. The upgrade includes adding a 9-foot chain link fence topped with barbed wire, an automatic gate, and an awning to protect property on the lot. This project also includes construction of an evidence processing structure.
Total Cost
$378,689
Completion Date
March 2025
Parks
Project Description
Phase II improvements at Jerry Matheson Park includes shade structures for the new playground and splashpad, adequate storage for the pool area to house chemicals and supplies, additional parking, and new walking trails.
Total Project Cost
$881,374
Completion Date
April 2025
Project Documents
Streets & Drainage
Project Description
Improve the walkability in the downtown area by upgrading and enhancing the public alleyways in Old Town. Phase 1 includes the alleys located in the 100 north and south blocks and 200 north blocks.
Total Project Cost
$1,693,113
Completion Date
December 2024
Project Description
Study and design of drainage improvements along S. Persimmon from Lizzie Lane to increase flow and capacity.
Total Project Cost
$90,656
Project Completion Date
August 2024
Project Description
Design and construction of retaining wall along the drainage channel located behind North Star Estates due to wall failure.
Total Project Cost
$198,820
Project Completion Date
April 2025
Project Description
Drainage improvements along Anna Street for better conveyance to S. Cherry Street.
Total Project Cost
$131,800
Project Completion Date
June 2025
Project Description
N. Sycamore Street Parking Project consists of the reconstruction of the pavement, addition of 36 parking spaces on the west side of the roadway (along the open ditch next to the railroad tracks), and the addition of sidewalks from FM 2920 to Houston Street. Project will start October 2024 and is anticipated to take 3 months to complete.
Total Project Cost
$457,069
Project Completion Date
June 2025
Water & Wastewater
Project Description
Rehabilitation of the exterior of the Pine Street elevated storage tank.
Total Project Cost
$293,276
Project Completion Date
June 2024
Project Description
Full rehabilitation of the water well 5 to include cleaning, survey, inspection, pump and motor rebuild/replacement, and internal component replacement. The rehabilitation is expected to gain a minimum of 15% increase in pumping capacity once complete.
Total Project Cost
$391,140
Project Completion Date
December 2024
Project Description
Full rehabilitation of the the Pine Street Water Well 2 based on performance testing conducted in December 2023. Recommendations included shaft size be upsized to safely accommodate increased performance. By completing the recommended rehabilitation, the well would increase the pumping to the design flow.
Total Project Cost
$394,571
Project Completion Date
March 2025
Project Description
Design and construction of a 12-inch water line to replace the existing water line along Oak Street and Clayton Street due to deteriorating conditions of the existing lines and constant disruption of service to residents for repairs.
Total Project Cost
$349,796
Completion Date
January 2026
Gas
Project Description
Conversion of approximately 1.5 miles of steel main to poly lines along Cherry Street.
Total Project Cost
$450,998
Project Completion Date
April 2025
Project Description
Design and construction of gas gate to service new development and add capacity in natural gas system.
Total Project Cost
$775,197 (cost shared with developments)
Project Completion Date
June 2024