| COT STM-02 (PDF) | POND MAINTENANCE REQUIREMENTS | 09/07/2017 |
| COT STM-03 (PDF) | SAN OR STORM CRUSHED STONE FOUNDATION FOR WET STABLE TRENCH | 09/07/2017 |
| COT STM-04 (PDF) | STORM BEDDING & BACKFILL FOR DRY STABLE TRENCH | 09/07/2017 |
| COT STM-05 (PDF) | PRECAST CONCRETE BOX FOR DRY STABLE TRENCH | 09/07/2017 |
| COT STM-06 (PDF) | PRECAST CONCRETE BOX FOR WET STABLE TRENCH | 09/07/2017 |
| COT STM-07 (PDF) | PRECAST CONCRETE BOX WITH SEAL SLAB | 09/07/2017 |
| COT STM-08 (PDF) | STORM SEWER MANHOLE FRAME AND COVER CONSTRUCTION DETAILS | 09/07/2017 |
| COT STM-09 (PDF) | TYPE "C" STORM SEWER MANHOLE FOR 42" PIPE AND SMALLER | 08/26/2019 |
| COT STM-10 (PDF) | STORM SEWER JUNCTION BOX FOR MAX 24" DIA PIPE | 09/07/2017 |
| COT STM-11 (PDF) | MANHOLE FOR PROPOSED BOX STORM SEWER CONSTRUCTION DETAILS | 09/07/2017 |
| COT STM-12 (PDF) | MANHOLE BLOCKOUT FOR STORM SEWER IN PAVEMENT DETAIL | 09/07/2017 |
| COT STM-13 (PDF) | TYPE "A" INLET CONSTRUCTION DETAILS | 09/07/2017 |
| COT STM-14 (PDF) | TYPE "B-B" INLET CONSTRUCTION DETAILS | 09/07/2017 |
| COT STM-15 (PDF) | TYPE "B-B" INLET RELOCATION CONSTRUCTION DETAILS | 09/07/2017 |
| COT STM-16 (PDF) | CAST IRON PLATE & FRAME FOR TYPE "B" INLETS | 09/07/2017 |
| COT STM-17 (PDF) | CAST IRON PLATE, FRAME, & "I" BEAM FOR TYPE "B-B" INLET | 09/07/2017 |
| COT STM-18 (PDF) | TYPE "C", "C-1", "C-2", & "C-3" INLETS CONSTRUCTION DETAILS | 09/07/2017 |
| COT STM-19 (PDF) | PRECAST TYPE "C" INLET CONSTRUCTION DETAILS | 09/07/2017 |
| COT STM-20 (PDF) | TYPE "D" INLET CONSTRUCTION DETAILS | 09/07/2017 |
| COT STM-21 (PDF) | TYPE "E" INLET CONSTRUCTION DETAILS | 09/07/2017 |
| COT STM-22 (PDF) | TYPE "H-2" INLET CONSTRUCTION DETAILS | 09/07/2017 |
| COT STM-23 (PDF) | PRECAST "H-2" INLET CONSTRUCTION DETAILS | 09/07/2017 |
| COT STM-24 (PDF) | CAST IRON INLET GRATE CONSTRUCTION DETAIL | 09/07/2017 |
| COT STM-25 (PDF) | STORM SEWER JOINT WRAP CONSTRUCTION DETAIL | 09/07/2017 |
| COT STM-26 (PDF) | RING GRATE FOR OPEN END OF 18" TO 72" STUBS TO DITCH | 09/07/2017 |
| COT STM-27 (PDF) | STORM SEWER CHOKE RESTRICTOR CONSTRUCTION DETAILS | 09/07/2017 |
| COT STM-28 (PDF) | CONCRETE CHANNEL LINING DETAILS | 09/07/2017 |
| COT STM-29 (PDF) | INTERCEPTOR STRUCTURE DETAILS | 09/07/2017 |
| COT STM-30 (PDF) | STORM SEWER & RIPRAP DETAILS | 09/07/2017 |
| COT STM-31 (PDF) | SAFETY END TREATMENT FOR PIPE CULVERTS PARALLEL DRAINAGE | 09/07/2017 |
| COT STM-32 (PDF) | SAFETY END TREATMENT FOR PIPE CULVERTS CROSS DRAINAGE | 09/07/2017 |
| COT STM-33 (PDF) | CONCRETE HEADWALLS W/FLARED WINGS FOR 0 SKEW PIPE | 09/07/2017 |
| COT STM-34 (PDF) | CONCRETE HEADWALLS W/FLARED WINGS FOR 15 SKEW PIPE | 09/07/2017 |
| COT STM-35 (PDF) | CONCRETE HEADWALLS W/FLARED WINGS FOR 30 SKEW PIPE | 09/07/2017 |
| COT STM-36 (PDF) | ONCRETE HEADWALLS W/FLARED WINGS FOR 45 SKEW PIPE | 09/07/2017 |
| COT STM-37 (PDF) | CONCRETE WINGWALLS W/STRAIGHT WINGS FOR 0 SKEW BOX CULVERTS | 09/07/2017 |
| COT STM-38 (PDF) | CONCRETE WINGWALLS W/FLARED WINGS FOR 0 SKEW BOX CULVERTS | 09/07/2017 |
| COT STM-39 (PDF) | CONCRETE WINGWALLS W/FLARED WINGS FOR SKEWED BOX CULVERTS | 09/07/2017 |